Photo credit: Design Plus
Location: Holland, MI
Architect: Design Plus (now Progressive AE)
Contractor: GDK
Square Footage: 240,000
Construction Cost: $18,700,000
Holland Christian High School saw several new additions as well as major renovations to the original 1960’s era facility. New construction included a classroom wing, media center, lecture hall, dining commons and kitchen, athletic locker rooms, and a central connecting commons area. This latter piece, a high volume space with clerestory and exposed structure, was built within the existing building footprint, requiring major demolition and renovation and reinforcing of the lower existing building roof for snow drift.